M.M. Miller

MILTON PATH EXTENSION

Milton, Wick

Project Value:

Project Overview

The construction of a Gabion basket retaining wall to create additional width to the footway adjacent to the A882 from Wick to Milton, installing a Kee-clamp barrier and surfacing the entire 300m long footpath.